Short answer: a pre-purchase building inspection checklist is the list of things you, the buyer, should collect, look at and ask before you rely on an inspection report. In Queensland that means reading the seller disclosure statement, walking the property with a short set of checks, knowing which signs justify an RPEQ structural engineer, and asking the inspector the right questions before your contract deadlines run out. A checklist helps you notice and ask. It does not replace a licensed inspection, and it cannot rule defects out.
This guide is about what you do as the buyer. If you want to know what an engineer’s inspection itself covers and excludes, read what a pre-purchase structural inspection includes.
Step 1: documents to ask for before you inspect
Since 1 August 2025 Queensland sellers must give buyers a seller disclosure statement (Form 2) before the contract is signed. It is useful, but it was not designed to answer structural questions. The Queensland Government lists the structural soundness of the building, flooding history and previous building or development approvals as things the statement does not have to cover. Those are the gaps you fill yourself.
| Document | Where it comes from | What to look for |
|---|---|---|
| Seller disclosure statement and title search | Seller (required before signing) | Easements, encumbrances, heritage listing, notices under the Building Act 1975, QBCC Act or Planning Act |
| Pool safety certificate or notice that there is none | Seller | If there is no current certificate, you take on the job of bringing the pool fence up to standard after settlement |
| Owner-builder notice | Seller, if owner-builder work was finished in the last 6 years | The work done and confirmation it is not covered by home warranty insurance |
| Approved plans and building records | Council (property or building records search) | Whether decks, extensions, enclosed carports and removed walls appear in the approval records |
| Flood information | Council flood mapping or flood property report | Flood levels and overlays affecting the lot |
| Home warranty insurance search | QBCC (usually done by your solicitor) | Whether recent building work still has cover; cover generally runs 6 years and 6 months |
| Body corporate records (units and townhouses) | Seller and body corporate | Defect reports, sinking fund plans, special levies and repair history |
Ask your solicitor or conveyancer which searches they already run. Legal and contract questions belong with them, not with an inspector or engineer.
Step 2: the site walk at the open home
You can do a lot in fifteen minutes with a torch, a phone camera and a marble or small level. Take photos of anything you tick so the inspector or engineer can see exactly what you saw.
Outside the house
- Cracks in brickwork: note the shape (straight, diagonal, stair-step), the widest point and whether one side of the crack sits proud of the other.
- Gaps where an extension, deck or garage meets the original house.
- Ground falling towards the walls, downpipes that discharge beside the footings, ponding or soggy garden beds.
- Large trees close to the house, and any recent tree removal (stumps, fresh turf).
- Retaining walls that lean, bulge, have open joints or show wet seepage at the base, especially on sloping blocks.
- Rusted steel posts, stirrups and fixings on decks, carports and patios.
Inside the house
- Doors and windows that stick, swing on their own or have uneven gaps at the top.
- Cracks above door and window corners, at cornices and along ceiling joints.
- Floors that slope, bounce or feel soft; a marble that rolls quickly is worth a note.
- Fresh paint or patching on one wall only, which can hide repaired cracks.
- Wet areas: cracked tiles, sinking showers, mould or swollen skirting near bathrooms and laundries.
- Sagging ceilings or a roof line that dips when you look at it from the street.
Under and above (if access is safe)
- High-set and older timber houses: look at stumps that lean, packers stacked under bearers, and damp or decayed timber.
- Walls that have been removed for open-plan living: is there a visible beam, and do posts below it sit on proper footings?
- Do not crawl into unsafe spaces or lift roof sheets. Inspectors and engineers work within access limits too, and their reports will say what they could not see.
Step 3: red flags that justify a structural engineer
A general building inspection is the usual starting point. Only a licensed building inspector can carry out a pre-purchase building inspection in Queensland, and termite inspections need a licensed pest controller, so book those with the right licence holders. Bring in an RPEQ structural engineer when the general report, or your own walk, raises questions about how the building is carrying load:
- Cracks wider than a few millimetres, stair-step cracking in brick, or cracks that the agent says “have always been there” but look fresh.
- Several doors jamming on the same side of the house, or floors that slope towards one corner.
- A wall removed with no visible beam, or a beam that sags.
- An extension, deck or second storey that does not show up in the approval records.
- Retaining walls over about a metre, or walls holding up a driveway, pool or house.
- A building report that says “refer to a structural engineer” for any item.
When cracking or movement is the main concern, a targeted crack and movement report answers the specific question of whether movement is old, ongoing or serious, and what it means for the purchase. If you are still deciding whether you need an engineer at all, our guide to cracks in walls explains which patterns usually matter.
Step 4: questions to ask your inspector
- What exactly does your report cover, and what will be excluded or not accessed (roof space, subfloor, behind furniture, outbuildings)?
- Will you note cracks with widths, locations and photos, or only describe them in general terms?
- Will you check retaining walls, decks, carports and other structures, or only the main house?
- How will you flag items that need a structural engineer, a plumber, an electrician or a pest inspector?
- When will I receive the report compared with my contract deadline?
- Can I call you to talk through the findings after I read the report?
The Queensland Government advises buyers to make sure they know exactly what the inspection report covers. If an answer is vague, ask for it in writing before you book.
Step 5: timing and contract conditions
The standard Queensland residential contract comes with a 5 business day cooling-off period, but auctions have none. Because of that, many buyers make the contract subject to satisfactory building and pest inspections, which lets them end the contract if the reports are poor. Discuss the wording and the dates with your solicitor before you sign. Practical timing tips:
- Book inspectors as soon as an offer looks likely; good inspectors are often booked days ahead.
- If an engineer is needed, tell them your inspection deadline at the first call so the scope fits the time you have.
- Do a pre-settlement inspection a few days before settlement to check nothing has changed.
Engineering fees depend on the property and the question being asked. Our guide on pre-purchase structural inspection cost explains what changes the scope and price.
Step 6: after the report arrives
Read the summary first, then every item marked major, structural or “refer to specialist”. Match each item to your own photos. If the report is unclear about whether a defect is structural, how urgent it is or what the repair might involve, you can send it to us for a second look. An Ostanes RPEQ engineer will tell you whether the findings need an on-site structural inspection and what that inspection should focus on. We assess and report on the structure; we do not carry out repairs, pest treatment or soil testing, and we cannot tell you whether to buy or what price to pay.
Pre-purchase checklist: common questions
What should I look out for in a pre-purchase structural site appraisal?
Focus on signs that the building is moving or not carrying load properly: cracks with a clear pattern, doors and windows out of square, sloping floors, sagging roof lines, leaning retaining walls and alterations with no approval record. Photograph each one and ask whether the inspector or engineer will measure and explain it.
Does a building and pest report replace a structural engineer?
No. A building inspection identifies visible defects across the whole property. A structural engineer answers a narrower question: why the structure is behaving the way it is and whether it is adequate. See our comparison of building inspection vs structural inspection.
Can a checklist tell me the house has no defects?
No. A checklist helps you notice things and ask better questions. Hidden defects can still exist behind linings, under slabs and in areas nobody can reach, and no inspection is a warranty against future defects.
What if the house has unapproved structures?
Approval history and structural adequacy are two separate checks. Ask your solicitor about the legal side and read our guide on buying a house with unapproved structures before you decide.
Get a second opinion before you commit
If your walk-through or building report has raised a structural question, send us the report and your photos. An RPEQ engineer will review them and tell you whether an on-site inspection is worth booking before your contract deadline.