Commercial Lease and Fit-Out Structural Checklist

Short answer: before you sign a commercial lease or start a fit-out in Queensland, get a structural engineer to check that the floor, roof and walls of the tenancy can carry what you plan to put there. The key questions are the floor load for your new use, any new openings in slabs or walls, anything you will hang from the roof or add on top of it, and the condition of the existing structure on the day you take possession. This checklist sets out what to look at, what to ask the landlord for, and what to give the engineer so the answer comes back quickly.

It is written for tenants, business owners, fit-out designers and property managers. It is a practical checklist, not legal or leasing advice: your lawyer or leasing agent handles the lease terms, and a building certifier decides what approvals the fit-out needs.

Why the structure matters before you sign

A tenancy that looks like an empty shell can still have limits you cannot see. A first-floor office may have been designed for desks, not for compactus storage or a server room. A warehouse slab may be fine for pallets but not for a racking system with heavy point loads at each upright. A retail shell may have a steel roof that was never meant to carry new air-conditioning plant.

Finding this out after the lease is signed is expensive. The fit-out may have to be redesigned, strengthening may be needed before you can open, and the time spent waiting usually comes out of your rent-free period. Checking first lets you negotiate with real information, and it tells your fit-out designer which ideas are simple and which need engineering.

Pre-lease structural checklist

Use this list on your inspection of the tenancy, and give the answers to the engineer. Nothing here requires you to open up the building.

Item What to check or ask Why it matters
Original use of the space What was the tenancy designed and approved for? Ask the landlord for the building’s approved use and class if known. Floor loads and design actions depend on use. An office floor and a storage floor are designed differently.
Your planned use and heaviest items List storage, racking, compactus, safes, gym equipment, kitchens, cool rooms, tanks, machinery and their approximate weights. Concentrated loads, not the overall floor area, are what usually govern a check.
Floor type Ground slab, suspended concrete slab, steel deck or timber floor? Note the level and what is underneath. A suspended slab over a car park needs a different check from a slab on the ground.
Existing drawings Ask for structural drawings, slab plans, any previous engineering certificates and the details of earlier fit-outs. With drawings, much of the check can be desktop work. Without them, the engineer may need more site time.
Visible condition Photograph cracks in slabs and walls, sagging or stained ceilings, rust on steel, damaged columns and water entry. Existing defects affect what can be added and who is responsible for them later.
Walls you want to change Mark any wall you want to remove or cut a doorway through, including the shopfront. Some internal walls carry floors or roofs above; masonry and tilt panels need checking before any opening.
Roof and ceiling loads Note new rooftop plant, exhaust fans, signage, suspended ceilings, lighting rigs or equipment you will hang from the roof. Commercial roofs are often light steel structures with little spare capacity.
Penetrations Will plumbing, drainage or services need new holes in the slab, beams or walls? Coring through a slab can cut reinforcement or post-tensioning tendons, which is a serious problem.
Mezzanines and stairs Are you adding a mezzanine, platform or internal stair, or using an existing one? The new structure and the slab and footings under its columns both need design.
External works Awnings, signs, ramps, loading docks or bollards? These attach to the building or ground and may need their own engineering.
Engineer measuring a warehouse slab joint during a pre-lease commercial fit-out structural check

Fit-out items that most often need an engineer

Most fit-out work is non-structural: partitions, joinery, finishes, flooring. The items below are the ones that usually bring a structural engineer in.

  • Floor load changes. Moving from office to storage, adding a gym, a commercial kitchen or a library of files, or installing racking. The engineer checks the existing floor against the new loads and, if needed, designs spreader plates, local strengthening or a different layout.
  • Mezzanines and platforms. A steel mezzanine in a warehouse or retail tenancy needs its own design, and the existing slab under each column has to be checked for the point load. Our commercial structural engineering service covers mezzanine design, slab capacity checks and the related documentation.
  • Openings. Widening a shopfront, joining two tenancies or removing an internal wall may need a beam and posts, and a check of the footing under each post.
  • Slab penetrations and coring. The engineer can say where it is safe to core, and whether the slab needs scanning first.
  • Rooftop and suspended loads. Air-conditioning units, exhaust systems, solar panels and heavy ceiling-hung equipment need the roof members and connections checked.
  • Signage and awnings. Large signs and awnings are wind-loaded and need a properly designed connection to the building.

Recording the condition at lease start

A commercial lease often makes the tenant responsible for returning the premises in a particular condition. If cracks, leaks or damage already exist when you move in, a clear record of them made at the start can avoid arguments at the end of the lease. A dilapidation report records the visible condition of the structure with photographs and notes before your fit-out starts. The same type of report is also used when major building work is about to happen next door.

The report records condition; it does not decide who is responsible for repairs under your lease. That is a question for your lawyer or leasing agent, who can use the report as evidence.

Approvals: who decides what

A structural engineer does not issue building approvals. In Queensland, the building certifier decides whether your fit-out needs building approval, and council (or a planning consultant) deals with planning questions such as a material change of use. Brisbane City Council’s guidance for opening a restaurant or cafe, for example, notes that you may need planning approval and building approval, and suggests getting advice from a licensed private building certifier if you plan building work or will occupy a building that was not designed, built or adapted for that use. Other councils have similar guidance.

Fire safety can also be involved. Queensland Fire and Rescue’s position statement on the referral of building fit-outs says that building work or tenancy fit-outs that may affect installed special fire services should be referred to it as an advice agency, unless scope reduction guidelines apply. Your certifier and fire services consultant manage that process.

Where structural work is part of the fit-out, the certifier will usually ask for structural drawings and a design certificate from a registered engineer. Ostanes engineers are RPEQ-registered and provide the structural design, drawings and Form 15 design certification for the structural parts of the fit-out. Our guide to Form 15 in Queensland explains what that certificate covers.

What to send the engineer before you sign

A structural check before a lease is often time-sensitive. You can speed it up by sending:

  1. The address and tenancy number, and the date by which you need an answer.
  2. Any structural or architectural drawings the landlord can provide, plus details of earlier fit-outs.
  3. Your intended use and a sketch of the layout, showing heavy items, racking, mezzanines and walls to remove.
  4. Weights or product data sheets for heavy equipment, racking or storage systems.
  5. Photos of the floor, ceiling, roof structure (where visible), cracks and any damage.
  6. Your fit-out designer’s contact details, so the engineer can coordinate directly.

With this information, the engineer can usually say which items are straightforward, which need site inspection, and which need design before the fit-out can proceed.

Commercial and residential checks are not the same

People sometimes assume a commercial tenancy check is like a house inspection. It is not. Commercial buildings are designed for different loads, use different materials and connections, and are approved under a different building class. The design basis depends on the use and classification of the building. Our article on commercial vs residential structural engineering explains those differences in more detail.

Red flags to raise before you sign

  • Cracks in a suspended slab, especially with rust staining or water marks.
  • Columns or beams that have been damaged by vehicles or forklifts.
  • Roof sheeting or purlins sagging, rusted or patched.
  • Evidence of earlier fit-outs that removed walls or cut slabs, with no documentation.
  • Floors that bounce noticeably, or doors that bind as you walk past.
  • The landlord cannot tell you what the floor was designed for, and there are no drawings.

None of these automatically rules a tenancy out. They are reasons to ask for a structural check before you commit, and to put the outcome into your negotiation. Where cracking is the main concern, our crack and movement report assesses its cause and significance.

Frequently asked questions

Do I need a structural engineer for every commercial fit-out?

No. A fit-out made only of partitions, joinery and finishes may need no structural input. An engineer is usually needed when the fit-out adds load, removes or cuts structure, adds a mezzanine, puts plant on the roof or hangs heavy items from it. Your certifier will tell you which documents they need.

Can the engineer tell me the floor capacity from photos?

Photos help with condition, but they cannot confirm capacity. Capacity comes from drawings, the original design basis or site investigation of the floor. If there are no drawings, the engineer will explain what site work is needed to give a reliable answer.

Who pays for the structural check, the tenant or the landlord?

That depends on your negotiation and lease. Either party can engage the engineer. The report should state who it was prepared for and what it was prepared for.

Does a structural check replace the building certifier?

No. The engineer designs and certifies the structural parts. The certifier decides on building approval for the whole fit-out, and other consultants handle fire, services and accessibility.

Book a pre-lease structural check

If you are about to sign a lease or brief a fit-out designer, send us the tenancy address, your intended use and any drawings you have. An RPEQ engineer will tell you what can be checked from documents, what needs a site visit, and what the structural parts of your fit-out will need. Contact Ostanes Engineering to arrange it.

WRITTEN BY

Dr. Shoja Jamali

Dr. Shoja Jamali is the founder of Ostanes Engineering. He has over a decade of experience as a professional engineer, working on major infrastructure projects such as Melbourne Metro, numerous bridge projects and structural inspections. He remains active in both academia and industry.
Get In Touch

Discuss Your Brisbane Project With a BPEQ Engineer

Need certified structural design, independent defect investigation, or council approval documentation in Brisbane? Contact our engineering team for expert technical advice and a competitive quote.

Speak with an Engineer